亚洲国产成人精品福利_久久国产精品久久香蕉_五月激情亚洲三区_亚洲国产AV乱码无码中文

PV Assembly Line
PV Assembly Line
Release time:2017-05-10 11:49:00 Click on the:

Function Description


The Equipment is used for laying-up the soldered stringing Cells on Glass or EVA according to requirements of process dimensions and layout direction, compose the Cell string Array. Glass/EVA transmitted to pointed location through conveyor device, and mechanical positioning, for axis Manipulator grasp Cell Stringing to achieve intelligent Camera defects detection, positioning, automatic typesetting, and automatic lay outing function. The Equipment is connected by synchronous belt transmission, realized automatic Solar Panel Assembly line operation.


Main Technical Parameters
Suitable for Solar Module Size: L(13002000)×W(8001100)mm
Stringing Cell Size: 125(812pcs/stringing); 156(812pcs/stringing)
Dimensions: 3480×2700×2100mm
Different Size Module Switching Time: ≤20min
Stringing Cell Spacing: 110mm (Adjustable)
Stringing Cell Positioning Precision: ±0.2mm
Laying-up Efficiency: ≤16s/stringing
Stringing Cell Input Height: ≤1150mm
Solar Module Transmission Height: 950±35mm
Air Pressure: 0.50.8MPa
Total Power: 4.5Kw